MTK Calendar Migration

From GWAVA Technologies Training
Revision as of 21:06, 23 June 2017 by Stephanf (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Contents

Calendar and Task Migration

To migrate calendar and task items, the EMail Migrator uses SMTP to transfer the data. For best performance, the user CSV file created during User Migration should be split into 200 user segments. This allows you to also run the migration on multiple workstations.

Prerequisites

  • Exported eDirectory, or Merged eDirectory and GroupWise user CSV file, split into 200 user segments.
  • Users migrated to Exchange/O365
  • SMTP relay configured

Configure Calendar Migration

Under Configuration | General, set Migration Items to Calendar

Configure Migration Criteria

  • Set Configuration | Migration Criteria
  • Set start and end dates, if attachments are to be migrated and if attachment size is to be limited
  • Press Save

Calendar and Task Migration

  • Press "Load Users" to load the CSV file.
  • Select none to migrate all users or click on a user select one user, or use Shift to select continuous multiple users or Control for discontinuous multiple users.
  • Press Start to being the migration process.

Exchange 2016 EWS Error

Un-updated Exchange 2016 EWS may throw the error: “Operation failed. Cannot query rows in a table” [1] install Exchange Server 2016 Cumulative Update 3 or later [2].


Return to Retain_Migration_Toolkit

Personal tools
Namespaces

Variants
Actions
Home
Exchange
GroupWise
JAVA
Linux
MTK
Retain
GW Monitoring and Reporting (Redline)
GW Disaster Recovery (Reload)
GW Forensics (Reveal)
GWAVA
Secure Messaging Gateway
GW Mailbox Management (Vertigo)
Windows
Other
User Experience
Toolbox
Languages
Toolbox